HB106 (2022) Detail

Establishing procedures for municipal host customer-generators of electrical energy.


HB 106 106 - AS INTRODUCED

 

 

2021 SESSION

21-0046

10/06

 

HOUSE BILL 106

 

AN ACT establishing procedures for municipal host customer-generators of electrical energy.

 

SPONSORS: Rep. Lang, Belk. 4; Rep. Pearl, Merr. 26; Rep. Aron, Sull. 7; Rep. M. Moffett, Merr. 9; Rep. Love, Rock. 6; Rep. Deshaies, Carr. 6; Rep. Trottier, Belk. 6; Rep. McGhee, Hills. 27; Sen. Bradley, Dist 3; Sen. Giuda, Dist 2; Sen. Hennessey, Dist 1

 

COMMITTEE: Science, Technology and Energy

 

─────────────────────────────────────────────────────────────────

 

ANALYSIS

 

This bill establishes an exemption under net energy metering for group net metered facilities that generate electricity to offset electrical requirements of a group consisting of political subdivisions.

 

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

 

Explanation: Matter added to current law appears in bold italics.

Matter removed from current law appears [in brackets and struckthrough.]

Matter which is either (a) all new or (b) repealed and reenacted appears in regular type.

21-0046

10/06

 

STATE OF NEW HAMPSHIRE

 

In the Year of Our Lord Two Thousand Twenty One

 

AN ACT establishing procedures for municipal host customer-generators of electrical energy.

 

Be it Enacted by the Senate and House of Representatives in General Court convened:

 

1  Eligible Customer Generator; Exception Added for Municipal Hosts.  Amend RSA 362-A:1-a, II-b through II-d to read as follows:

II-b.  "Eligible customer-generator" or "customer-generator" means an electric utility customer who owns, operates, or purchases power from an electrical generating facility either powered by renewable energy or which employs a heat led combined heat and power system, with a total peak generating capacity of up to and including one megawatt, except as provided for a municipal host and a low-moderate income community solar project as defined in RSA 362-F:2, X-a, that is located behind a retail meter on the customer's premises, is interconnected and operates in parallel with the electric grid, and is used to offset the customer's own electricity requirements.  Incremental generation added to an existing generation facility, that does not itself qualify for net metering, shall qualify if such incremental generation meets the qualifications of this paragraph and is metered separately from the nonqualifying facility.

II-c.  "Municipal host" means a customer-generator with a total peak generating capacity of greater than one megawatt used to offset the electricity requirements of a group consisting of one or more customers who are political subdivisions, provided that all customers are located within the same utility franchise service territory.  A municipal host shall be located in the same municipality as all group members if the facility began operation after January 1, 2020.  A municipal host may be owned by either a public or private entity.  In this paragraph, "political subdivision" means any city, town, county, school district, chartered public school, village district, school administrative unit, or any district or entity created for a special purpose administered or funded by any of the above named governmental units.

II-d.  "Eligible fuel" means natural gas, propane, wood pellets, hydrogen, or heating oil when combusted with a burner, including air emission standards for the device using the approved fuel.

[II-d] II-e.  "Heat led" means that the combined heat and power system is operated in a manner to satisfy the heat usage needs of the customer-generator.

2  New Paragraphs; Limited Electrical Energy Producers Act; Net Energy Metering.  Amend RSA 362-A:9 by inserting after paragraph XVIII the following new paragraphs:

XVIII-a.  A hydroelectric generator with a total peak generating capacity that is at or below the capacity eligibility requirements set forth in RSA 362-A:1-a, II-b and that first became operational before July 1, 2021 and shares equipment or facilities with another generator or electric utility customer for interconnection to the electric grid, shall be eligible to participate in net energy metering as a customer-generator even if the aggregate capacity of the generators sharing equipment or facilities for interconnection to the electric grid exceeds the capacity eligibility requirements set forth in RSA 362-A:1-a, II-b.  Such customer generator shall be eligible to participate in net energy metering as a customer-generator in a manner consistent with all other hydroelectric customer-generators of the same total peak generating capacity.

XVIII-b.  Any provisions of settlement agreements or orders that have been approved or issued by the commission that relate to a distribution utility’s treatment of the output from qualifying facilities or independent power producers shall not apply to the output from an eligible customer-generator participating in net metering.  

3  Effective Date.  This act shall take effect 60 days after its passage.

Links


Date Body Type
Feb. 19, 2021 House Hearing
March 8, 2021 House Exec Session
March 5, 2021 House Exec Session
March 8, 2021 House Exec Session
March 19, 2021 House Exec Session
March 19, 2021 House Exec Session
March 8, 2021 House Exec Session
Oct. 26, 2021 House Exec Session
Nov. 4, 2021 House Floor Vote
March 5, 2021 House Exec Session
March 19, 2021 House Exec Session
Nov. 4, 2021 House Floor Vote

Bill Text Revisions

HB106 Revision: 31391 Date: Jan. 13, 2021, 1:03 p.m.

Docket


Jan. 11, 2022: Inexpedient to Legislate: MA VV 01/05/2022 HJ 1


Nov. 8, 2021: Committee Report: Inexpedient to Legislate HB106 11/04/2021 (Vote 20-0; CC) HC 48 P. 15


: Committee Report: Inexpedient to Legislate HB106 11/04/2021 (Vote 20-0; CC)


Oct. 26, 2021: Executive Session: 10/26/2021 10:00 a.m. LOB302-304


Sept. 7, 2021: Subcommittee Work Session: 09/15/2021 10:00 am LOB 302-304


Sept. 15, 2021: Subcommittee Work Session: 09/15/2021 10:00 am LOB 302-304


March 10, 2021: Full Committee Work Session: 03/19/2021 09:00 am Members of the public may attend using the following link: To join the webinar: https://www.zoom.us/j/93683395113 / Executive session on pending legislation may be held throughout the day (time permitting) from the time the committee is initially convened.


March 19, 2021: Full Committee Work Session: 03/19/2021 09:00 am Members of the public may attend using the following link: To join the webinar: https://www.zoom.us/j/93683395113 / Executive session on pending legislation may be held throughout the day (time permitting) from the time the committee is initially convened.


March 19, 2021: Full Committee Work Session: 03/19/2021 09:00 am Members of the public may attend using the following link: To join the webinar: https://www.zoom.us/j/93683395113 / Executive session on pending legislation may be held throughout the day (time permitting) from the time the committee is initially convened.


: Retained in Committee


March 8, 2021: ==RECESSED== Executive Session: 03/08/2021 10:00 am Members of the public may attend using the following link: To join the webinar: https://www.zoom.us/j/96232478698


March 10, 2021: Retained in Committee


: Retained in Committee


March 8, 2021: ==RECESSED== Executive Session: 03/08/2021 10:00 am Members of the public may attend using the following link: To join the webinar: https://www.zoom.us/j/96232478698


March 5, 2021: Full Committee Work Session: 03/05/2021 10:00 am Members of the public may attend using the following link: To join the webinar: https://www.zoom.us/j/95412375991 / Executive session on pending legislation may be held throughout the day (time permitting) from the time the committee is initially convened.


March 8, 2021: Executive Session: 03/08/2021 10:00 am Members of the public may attend using the following link: To join the webinar: https://www.zoom.us/j/96232478698


Feb. 25, 2021: Full Committee Work Session: 03/05/2021 10:00 am Members of the public may attend using the following link: To join the webinar: https://www.zoom.us/j/95412375991 / Executive session on pending legislation may be held throughout the day (time permitting) from the time the committee is initially convened.


Feb. 19, 2021: Public Hearing: 02/19/2021 09:00 am Members of the public may attend using the following link: To join the webinar: https://www.zoom.us/j/97871766128 / Executive session on pending legislation may be held throughout the day (time permitting) from the time the committee is initially convened.


Jan. 6, 2021: Introduced (in recess of) 01/06/2021 and referred to Science, Technology and Energy HJ 2 P. 35


Jan. 4, 2021: Introduced (in recess of) 01/06/2021 and referred to Science, Technology and Energy HJ 2 P. 35


Jan. 6, 2020: To Be Introduced 01/06/2020 and referred to Science, Technology and Energy