HB1491 (2022) Detail

Relative to natural gas transmission pipeline safety.


CHAPTER 75

HB 1491-FN-LOCAL - FINAL VERSION

 

15Mar2022... 0547h

2022 SESSION

22-2487

12/10

 

HOUSE BILL 1491-FN-LOCAL

 

AN ACT relative to natural gas transmission pipeline safety.

 

SPONSORS: Rep. Alexander Jr., Hills. 6

 

COMMITTEE: Science, Technology and Energy

 

─────────────────────────────────────────────────────────────────

 

AMENDED ANALYSIS

 

This bill requires developers to notify the operator of a natural gas transmission pipeline prior to approval of an application for a development project that is within 1,000 feet of the pipeline.

 

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

 

Explanation: Matter added to current law appears in bold italics.

Matter removed from current law appears [in brackets and struckthrough.]

Matter which is either (a) all new or (b) repealed and reenacted appears in regular type.

15Mar2022... 0547h 22-2487

12/10

 

STATE OF NEW HAMPSHIRE

 

In the Year of Our Lord Two Thousand Twenty Two

 

AN ACT relative to natural gas transmission pipeline safety.

 

Be it Enacted by the Senate and House of Representatives in General Court convened:

 

75:1  Legislative Intent and Purpose.

I.  The legislature intends in this acts to create a pipeline safety dialogue between property developers and owners and natural gas transmission pipeline operators when new land use or property development is planned near a transmission pipeline.

II.  When a new development of any kind occurs near an interstate transmission pipeline, federal law can require additional modifications be made to the pipeline for the safety of others.  This act would protect the transmission pipeline by promoting adequate safety consideration of the impacts of the property development on the pipeline, with considerable time before construction begins.  Developers would become aware of the existence of pipelines, and could factor the location of these facilities into the design phases of their projects, while also allowing pipeline operators time to make adjustments to the facilities.

75:2  New Subdivision; Advance Pipeline Notification.  Amend RSA 674 by inserting after section 74 the following new subdivision:

Advance Pipeline Notification

674:75  Advance Pipeline Notification.

I.  As used in this section, "natural gas transmission pipeline" means an interstate pipeline, as that term is defined in 15 U.S.C. Section 3301(15); and

II.  For a new residential or nonresidential development that is located in whole or in part within 1,000 feet of the center point of a natural gas transmission pipeline that was constructed or operated prior to the development, the applicant shall notify the operator of the natural gas transmission pipeline of the planned development no later than the time of application for approval of the development, or 180 days prior to commencement of construction, whichever is earlier.

III.  The developer of the development shall provide on a form filed with the local land use board the following notice:

"All reasonable means were used to obtain information about natural gas transmission pipeline facilities in the area of the proposed development and pipeline operator(s) were contacted to verify the location of the pipeline and the pipeline easement.  The developer has reviewed, or attempted to review, preliminary information about the proposed development with the pipeline operator."

IV.  Within 60 days of the effective date of this section, a local land use board in a municipality that is within 1,000 feet of the center point of a natural gas transmission pipeline shall make National Pipeline Mapping System geospatial data available to developers from the Pipeline and Hazardous Materials Safety Administration within the United States Department of Transportation relative to the locations of pipelines.

V.  Upon receiving notice of a planned development in accordance with this section, a pipeline operator shall locate and mark the natural gas pipeline facilities and provide pipeline facility information to the developer by other means such as marking up design drawings and providing maps.

VI.  A building permit shall not be issued, and a building shall not be erected on a lot within the jurisdiction of a local land use board unless one of the following 3 criteria is met:

(a)  The developer has received written consent from the natural gas pipeline operator and has filed this consent with such regional planning commission;

(b)  The developer has not received written consent from the natural gas pipeline operator, but has filed with such local land use board written correspondence from the pipeline operator demonstrating that discussions and outreach have occurred; or

(c)  The developer has filed dated and written correspondence with such local land use board that demonstrates attempts to contact the natural gas pipeline operator and that no response has been received within 180 days of the filing.

VII.  This section applies only to counties and municipalities that are governed by a local land use board for purposes of approving residential and nonresidential developments.

75:3  Effective Date.  This act shall take effect January 1, 2023.

 

Approved: May 20, 2022

Effective Date: January 01, 2023

 

 

Links


Date Body Type
Feb. 8, 2022 House Hearing
March 1, 2022 House Exec Session
House Floor Vote
March 29, 2022 Senate Hearing
April 21, 2022 Senate Floor Vote

Bill Text Revisions

HB1491 Revision: 36490 Date: May 23, 2022, 4:24 p.m.
HB1491 Revision: 35870 Date: April 22, 2022, 9:56 a.m.
HB1491 Revision: 35286 Date: March 22, 2022, 3:55 p.m.
HB1491 Revision: 35111 Date: March 4, 2022, 4:11 p.m.
HB1491 Revision: 34149 Date: Dec. 3, 2021, 2:28 p.m.

Docket


May 24, 2022: Signed by Governor Sununu 05/20/2022; Chapter 75; Eff. 1/1/2023


May 13, 2022: Enrolled (in recess of) 05/12/2022


May 13, 2022: Enrolled Adopted, VV, (In recess 05/12/2022); SJ 13


April 21, 2022: Ought to Pass: MA, VV; OT3rdg; 04/21/2022; SJ 9


April 13, 2022: Committee Report: Ought to Pass, 04/21/2022; Vote 5-0; CC; SC 16


March 24, 2022: Hearing: 03/29/2022, Room 103, SH, 10:00 am; SC 13


March 22, 2022: Introduced 03/17/2022 and Referred to Energy and Natural Resources; SJ 6


March 16, 2022: Ought to Pass with Amendment 2022-0547h: MA VV 03/15/2022 HJ 6


March 16, 2022: Amendment # 2022-0547h: AA VV 03/15/2022 HJ 6


March 7, 2022: Committee Report: Ought to Pass with Amendment # 2022-0547h (Vote 22-0; CC)


March 1, 2022: Executive Session: 03/01/2022 10:00 a.m. LOB306-308


Feb. 8, 2022: Public Hearing: 02/08/2022 3:00 p.m. LOB306-308


Dec. 3, 2021: Introduced 01/05/2022 and referred to Science, Technology and Energy