SB230 (2025) Compare Changes


The Bill Text indicates a new section is being inserted. This situation is not handled right now, and the new text is displayed in both the changed and unchanged versions.

Unchanged Version

Text to be removed highlighted in red.

1 New Paragraph; Electric Utility Restructuring; Definitions. Amend RSA 374-F:2 by inserting after paragraph II the following new paragraph:

II-a "Small modular reactors" or "SMRs" means advanced nuclear reactors that have a power capacity of up to 300 MW per unit.

2 Electric Utility Investment in Distributed Energy Resources; Definitions. Amend RSA 374-G:2, I(b) to read as follows:

(b) "Distributed energy resources" means energy storage, electric generation equipment including clean and renewable generation, energy efficiency, demand response, load reduction or control programs, or technologies or devices located on or interconnected to the local electric distribution system for purposes including but not limited to reducing line losses, supporting voltage regulation, or peak load shaving, as part of a strategy for minimizing transmission and distribution costs as provided in RSA 374-F:3, III.

3 Effective Date. This act shall take effect 60 days after its passage.

Changed Version

Text to be added highlighted in green.

1 New Paragraph; Electric Utility Restructuring; Definitions. Amend RSA 374-F:2 by inserting after paragraph II the following new paragraph:

II-a "Small modular reactors" or "SMRs" means advanced nuclear reactors that have a power capacity of up to 300 MW per unit.

2 Electric Utility Investment in Distributed Energy Resources; Definitions. Amend RSA 374-G:2, I(b) to read as follows:

(b) "Distributed energy resources" means energy storage, electric generation equipment including clean and renewable generation, including SMRs as defined inRSA 374-F:2, II-a, energy efficiency, demand response, load reduction or control programs, or technologies or devices located on or interconnected to the local electric distribution system for purposes including but not limited to reducing line losses, supporting voltage regulation, or peak load shaving, as part of a strategy for minimizing transmission and distribution costs as provided in RSA 374-F:3, III.

3 Effective Date. This act shall take effect 60 days after its passage.