HB 1475-FN - AS INTRODUCED
2026 SESSION
26-2955
06/07
HOUSE BILL 1475-FN
SPONSORS: Rep. Harrington, Straf. 18; Rep. Berezhny, Graf. 11; Rep. Bernardy, Rock. 36; Rep. D. Thomas, Rock. 16; Rep. Vose, Rock. 5
COMMITTEE: Science, Technology and Energy
-----------------------------------------------------------------
ANALYSIS
This bill directs the department of energy to study the fixed and variable components of electric distribution costs in New Hampshire, evaluate specific cost categories, and report its findings.
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Explanation: Matter added to current law appears in bold italics.
Matter removed from current law appears [in brackets and struckthrough.]
Matter which is either (a) all new or (b) repealed and reenacted appears in regular type.
26-2955
06/07
STATE OF NEW HAMPSHIRE
In the Year of Our Lord Two Thousand Twenty-Six
Be it Enacted by the Senate and House of Representatives in General Court convened:
1 Department of Energy; Study Required.
I. The department of energy shall conduct a study of electric distribution utilities operating in New Hampshire to determine what portion of distribution costs are fixed and do not vary with a customer’s electricity usage, and what portion are variable and directly related to the quantity of electricity consumed.
II. For the purposes of this section:
(a) “Fixed charge” means a fee that is assessed to each customer in a rate class, without regard to kilowatt-hours consumed.
(b) “Usage-based charge” means a fee that varies according to the number of kilowatt-hours consumed during a billing period.
III. The department shall consider, but not be limited to, the following cost categories in its study:
(a) Storm recovery costs;
(b) Costs for replacement of utility poles and other infrastructure not dependent on usage; and
(c) Costs relating to capacity upgrades or additions required by increased electric demand.
IV. The department may consult with electric utilities and independent experts as needed.
V. The department shall submit a report, including recommendations, to the house science, technology and energy committee, the senate energy and natural resources committee, and the governor, no later than November 1, 2026. The report shall be made available to the public.
2 Effective Date. This act shall take effect upon its passage.
26-2955
11/30/25
HB 1475-FN- FISCAL NOTE
AS INTRODUCED
FISCAL IMPACT: This bill does not provide funding.
|
| |||||
Estimated State Impact | ||||||
| FY 2026 | FY 2027 | FY 2028 | FY 2029 | ||
Revenue | $0 | $0 | $0 | $0 | ||
Revenue Fund(s) | None | |||||
Expenditures* | $0 | Indeterminable Increase $1,000,000+ (Utility Assessments) | De Minimis Increase (Various Funds)
| |||
De Minimis Increase (Various Funds) | ||||||
Funding Source(s) | Utility Assessments and Various Funds | |||||
Appropriations* | $0 | $0 | $0 | $0 | ||
Funding Source(s) | None | |||||
*Expenditure = Cost of bill *Appropriation = Authorized funding to cover cost of bill | ||||||
| ||||||
Estimated Political Subdivision Impact | ||||||
| FY 2026 | FY 2027 | FY 2028 | FY 2029 | ||
County Revenue | $0 | $0 | $0 | $0 | ||
County Expenditures | $0 | De Minimis Increase | ||||
Local Revenue | $0 | $0 | $0 | $0 | ||
Local Expenditures | $0 | De Minimis Increase | ||||
METHODOLOGY:
This bill requires the Department of Energy to conduct a study of fixed and variable components of electric distribution costs for New Hampshire distribution utilities and report findings and recommendations to the Governor and legislative committees by November 1, 2026.
The Department of Energy states this bill will require work to be performed through docketed investigations into each of the three electric distribution utilities operating in New Hampshire. The Department would hire one or more consultants to conduct cost-of-service analyses with emphasis on storm recovery costs, pole and infrastructure replacement, and capacity upgrades tied to demand. The Department assumes all consultant and proceeding costs would be specially assessed to the utilities under existing statutory authority, meaning there would be no cost to the Department’s operating budget. Because the consultant work would be procured through an RFP, the Department cannot precisely estimate the charges; however, it expects the combined consultant costs for all three utilities to be at least $1,000,000, which would be fully recovered through utility assessments.
Utilities are expected to pass these assessment costs through to ratepayers; however, the Department states the impact on individual customer bills, including state, county, and local accounts, would be de minimis.
AGENCIES CONTACTED:
Department of Energy
| Date | Body | Type |
|---|---|---|
| Jan. 26, 2026 | House | Hearing |
| Jan. 27, 2026 | House | Exec Session |
| Jan. 29, 2026 | House | Hearing |
| Feb. 3, 2026 | House | Exec Session |
Jan. 29, 2026: Executive Session: 02/03/2026 03:00 pm GP 229
Jan. 23, 2026: Public Hearing: 01/29/2026 01:00 pm GP 158
Jan. 21, 2026: ==CANCELLED== Executive Session: 01/27/2026 03:00 pm GP 229
Jan. 21, 2026: ==CANCELLED== Public Hearing: 01/26/2026 01:00 pm GP 229
Dec. 4, 2025: Introduced 01/07/2026 and referred to Science, Technology and Energy